Some Steps need to Check Before the Installation of Hammer Crusher
Time:2013-11-02 15:58 Author:clirik
Large machinery and equipment used in formally put into production, goes on trial to test various performance of equipment. CLIRIK on the basis of scientific production planning, reasonable arrangement of the installation and commissioning of
hammer crusher, which is divided into eight steps:
1.Before the installation can be chosen according to the sources of raw materials of good terrai
2, The machine by the anchor bolt on the concrete, to allow drainage trough design foundation, the slope can not less than 50 °, but the user can also according to the feeder and transport equipment
3, The motor should be in with the inlet in the opposite direction.
4.4.Electrical equipment is better to use convenient position
5. check whether the bearing inner appropriate lubricating oil.
6.Turn the rotor by hand, to see if it is normal, with or without friction phenomenon, if confirmed for sports shine, before starting, empty test after half an hour without noise, no swing, can into the bearing temperature rise shall not exceed 30 ℃.